Ground0%

Structure before finish

We draw in the order a building is actually built: ground, structure, skin, then finish. Nothing reaches a site that the people pouring it can’t read.

62Built since 2014
11Cities
4Mies nominations

The ground decides first.

Eighteen metres of set-back, one shadow line, the first metre of stone. The site settles the plan before we draw a single wall.

01 / Ground — Site strategy, Massing, Light study. Set-back 18 m, Levels 2.

Concrete is a drawing you pour once.

The shuttering is drawn at 1:5 before a board is cut. Every joint you will still see in ten years is decided here, in plywood.

02 / Formwork — Shuttering 1:5, Board joints, Pour sequence. Pours 4, Board 2.4 m.

Volume you can hear.

Seven point four metres of air, hard surfaces and one soft one overhead. The frame is tuned to speech before anything is clad — you can talk across it without raising your voice.

03 / Structure — Double height, Acoustic plaster, Exposed frame. Height 7.4 m, Span 18 m.

Rhythm you walk through.

Nine columns, nine metres apart, one bay of sunlight between each. The skin sets your pace, so you arrive already slowed down.

04 / Envelope — 9 m grid, In-situ concrete, Raking light. Bays 9, Grid 9 m.

One material carries it.

Local stone does the work. Oak and brass are here only for the joints, and nothing else is added — the rest is shadow and the way five o'clock lands.

05 / Finish — Local stone, Solid oak, Untreated brass. Palette 3, Stone 40 mm.

The last room is the quiet one.

The corridor ends in one room with a single deep window. Nothing is on the walls. What you notice is the light, the stone underfoot, and how quiet it is.

06 / Handover — Deep reveal, Oak lining, One window. Handed over 2026, Visits 1 / 3 / 10 yr.

Selected
Work

Six housing projects, 34 440 m², 2019–2026. Four handed over, two on site. Not one of them decorated.

Casa Pujades

Housing, Barcelona. 4 210 m². 2019 · Built.

Bloc Sant Martí

Social housing, Barcelona. 8 900 m². 2021 · Built.

Cases Tramuntana

Row houses, Girona. 3 180 m². 2022 · Built.

Pati Olot

Co-housing, Olot. 5 400 m². 2023 · Built.

Torre Mataró

Apartments, Mataró. 11 200 m². 2025 · On site.

Can Sitges

Refurbishment, Sitges. 1 550 m². 2026 · On site.

Six handed over, two on site. Yours would be the ninth — send us the plot number.

The
Studio

Twenty-two people, one workshop, one saw bench. Every project is built at 1:20 in card and timber before anyone pours it at 1:1.

Build it small first

No project leaves the studio without a physical model. A screen flattens what a hand reads in a second.

One material, argued

Every project earns exactly one dominant material. If the argument for it will not fit in a paragraph, it is the wrong material.

Detail at hand scale

The handrail is drawn at the same scale as the frame. Get the millimetre wrong and the metre is only decoration.

Stay until it works

We come back at year 1, 3 and 10 and write up what moved. Buildings fail slowly; we would rather be the ones who notice.

2014Founded
22People
1:20Every model
1 / 3 / 10Years we come back

Bring us
the site.

A plot number, a survey, or a photo taken from the road is enough to start. You get an honest read within five working days: what the site can hold, what it will cost to find out, and whether we are the right studio for it. Nothing is invoiced until there is a brief we have both signed.